Department of Industrial Engineering - Working Papers
These working papers should not be cited or reproduced in whole or in part without the permission of the author(s). Comments are solicited.
|
Year/# |
Author |
Title |
| 10-01 | Qi-Ming He | Construction of Continuous Time Markov Arrival Processes |
| 10-02 | Qi-Ming He, Hanqin Zhang, Juan Vera | On Some Properties of Bivariate Exponential Distributions |
| 10-03 | Qi-Ming He, Jiandong Ren | On Discrete Multivariate Phase-Type Distributions and Multivariate Claim Processes in Risk Analysis |
|
09-01 |
Qi-Ming He, Jingui Xie, Xiaobo Zhao |
Stability Conditions of a Preemptive Repeat Priority |
|
09-02 |
Jonathan Barzilai |
Game Theory Foundational Errors - Part III |
|
09-03 |
Jonathan Barzilai |
Game Theory Foundational Errors - Part IV |
|
09-04 |
Jonathan Barzilai |
Ordinal Utility and Indifference Curves |
|
08-01 |
Jonathan Barzilai |
Preference Function Modeling (PFM): The Mathematical Foundations of Decision Theory |
|
08-02 |
Jonathan Barzilai |
Game Theory Foundational Errors - Part II |
|
08-03 |
Jingui Xie, Qi-Ming He, Xiaobo Zhao |
|
| 07-01 |
He, Qi-Ming and Zhang, Hanqin |
Triangular order and Minimal Coxian Representations of Generalized Erlang Distributions |
| 07-02 | Eldon Gunn | Models for Strategic Analysis of Forest Management and the Forest Products Supply Chain |
|
07-03 |
Jonathan Barzilai |
Game Theory Foundational Errors - Part 1 |
|
07-04 |
Jonathan Barzilai |
On the Mathematical Foundations of Economic Theory |
|
06-01 |
Corinne MacDonald and Eldon Gunn |
Outline of a Framework for Analysis of Manufacturing Systems Using the PAC Scheme |
|
06-02 |
Corinne MacDonald and Eldon Gunn |
Constructing Optimal Policy Curves to Compare Manufacturing Control Strategies |
|
06-03 |
Eldon Gunn |
Financial Maturity Issues for Nova Scotian Softwoods |
|
06-04 |
Eldon Gunn |
A Note on Optimal Harvest Guidelines |
|
06-05 |
Eldon Gunn and Matthew Nelson |
A Neural Network Approach to an Individual Tree Model for Nova Scotia |
|
06-06 |
Corinne MacDonald and Eldon Gunn |
Determination of Valid Policies for the Production Authorization Card (PAC) System |
|
06-07 |
Eldon Gunn, Taher Saify/Attar and Tom MacAdam | Start Time Based Heuristics for Vehicle Routing with Time Windows |
|
05-01 |
Uday Venkatadri, Shentao Wang, and Ashok Srinivasan |
A Model for Demand Planning in Supply Chains |
|
05-02 |
He, Qi-Ming and Zhang, Hanqin |
An Algorithm for Computing Minimal Coxian Representations |
|
05-03 |
He, Qi-Ming and Zhang, Hanqin |
On Matrix-Exponential Distributions |
|
05-04 |
He, Qi-Ming and Zhang, Hanqin |
An Algorithm for Computing Coxian Representations of Coxian Distributions as Approximations to Matrix-Exponential Distributions and Phase-Type Distributions |
|
04-01 |
Qi-Ming He |
Analysis of a Continuous Time SM[K]/PH[K]/1/FCFS Queue: Age Process, Sohuen Times, Waiting Times, and Queue Lengths |
|
04-02 |
Qi-Ming He and Hanqin Zhang |
Spectral Polynomial Algorithms for Computing Bi-Diagonal Representations for Matrix-Exponential Distributions and Phase-Type Distributions, |
|
04-03 |
Qi-Ming He and Hanqin Zhang |
PH-Invariant Polytopes and the Generalized Erlang Representation for Phase Type Distributions |
|
04-04 |
E.A. Gunn |
Sustainable Forest Management: Control, Adaptive Management, Hierachical Planning |
|
04-05 |
E.A. Gunn and Evelyn Richards |
Solving the Adjacency Problem with Stand-Centred Constraints |
|
04-06 |
Qi-Ming He and Hanqin Zhang |
A Note on Unicyclic Representations of PH- Distributions |
|
04-07 |
E.A. Gunn |
A Neuro-Dynamic Programming Approach to the Optimal Stand Management Problem |
|
03-01 |
Benoit Montreuil and Uday Venkatadri |
Generating a Net Layout from a Block Layout |
|
03-02 |
Eldon A. Gunn and Bernie P. Lee. |
Using Lagrangian Relaxation and Integer Programming Heuristics for a Vehicle Fleet Maintenance Scheduling Problem |
|
03-03 |
Evelyn W. Richards and Eldon A. Gunn |
Tabu Search for Difficult Forest Management Optimization Problems |
|
03-04 |
|
Workload Process, Waiting times, and Sojourn Times in a Discrete Time MMAP[K]/1/FCFS Queue |
|
03-05 |
|
Age Process, Workload Process, Sojourn Times, and Waiting Times in a Discrete Time AM[K]/PH[K]/1/FCFS Queue |
|
02--01 |
Qi-Ming He and Marcel F. Neuts |
Two M/M/1 Queues with Transfers of Customers |
|
02--02 |
Qi-Ming He and Eldon Gunn |
On the Stochastic Roots of Stochastic Matrix |
|
02--03 |
Uday Venkatadri and Ashok Srinivasan |
Optimization Based Decision Support for Supply Network Planning (Fuqua School of Business, Duke University, Durham, NC, USA) |
|
01-01 |
Qi-Ming He |
Algorithms for Choosing Fitting Points for PH-distributions and Markov Arrival Processes |
|
01-02 |
Qi-Ming He and Hui Li |
Stability Conditions of the MMAP[K]/G[K]/1/LCFS Preemptive Repeat Queue |
|
01-03 |
Pall Jensson and Eldon A. Gunn |
Optimization of Production Planning in Fish Farming |
|
01-04 |
Qi-Ming He and Hui Li |
A Linear Program Approach to Ergodicity of M/G/1 Type Markov Chains with a Tree Structure |
|
01-05 |
Qi-Ming He |
The Classification of Markov Chains of Matrix GI/M/1 Type with a Tree Structure and its Queueing Applications |
|
00-01 |
Qi-Ming He and Marcel F. Neuts |
On the Convergence and Limits of a Matrix Sequence Arising in Quasi Birth -and-Death Markov Chains |
|
00-02 |
|
Getting Results Using Tabu Search: Solving a Hard Forest Management Optimization Problem |
|
00-03 |
Evelyn W. Richards and Eldon A. Gunn |
A Model and Tabu Search Method to Optimize Schedules for Stand Harvests and Road Construction |
|
00-04 |
Qi-Ming He |
A Fixed Point Approach to the Classification of Markov Chains with a Tree Structure |
|
00-05 |
Yigal Gerchak and Qi-Ming He |
On the Relation Between the Benefits of Risk Pooling and the Variability of Demand |
|
98-01 |
J.T. Blake and M.W. Carter |
A Goal Programming Approach to Strategic Resource Allocation in Acute Care Hospitals |
|
98-02 |
Q.M. He, H. Li and Y.Q. Zhao |
Ergodicity of the BMAP/PH/s/s+K Retrial Queue with PH-Retrial Times |
|
98-03 |
QiMing He |
Classification of Markov Processes of M/G/1 type with a Tree Structure and its Applications to Queueing Models |
|
98-04 |
J.T. Blake and M.W. Carter |
Analyzing Policy Options with Operational Research: Examples from Ontario |
|
98-05 |
Qi-Ming He |
Classification of Markov Processes of Matrix M/G/1 type with a Tree Structure and its Applications to the MMAP[K]/G[K]/1 Queue |
|
98-06 |
Stanislav Karapetrovic and E.S. Rosenbloom |
A Quality Control Approach to Consistency Paradoxes in AHP |
|
98-07 |
Stanislav Karapetrovic and Walter Willborn |
Holonic Model for a Quality System in Academia |
|
98-08 |
Stanislav Karapetrovic |
ISO 9000: The System Emerging from the Vicious Circle of Compliance |
|
97-01 |
Q.M. He and M.F. Neuts |
Markov Chains With Marked Transitions |
|
97-02 |
Q.-M. He, Hui Li and Pemberton J. Cyrus |
A MAP/G/1 Queue With Cyclic Service Times |
|
97-03 |
Q.-M. He and D. Stanford |
Distributions of the Interdeparture Times in the MMAP (2)/G(2)/1 Queues |
|
97-04 |
Q.-M. He |
The Versatility of the MMAP[K] and the MMAP[K]/G[K]/1 Queue |
|
97-05 |
Q.-M. He, Attahiru Sule Alfa |
The MMAP[K]/PH[K]/1 Ques with a Last-Come-First-Served Preemptive Service Discipline |
|
97-06 |
Q.-M. He |
Quasi-Birth-and-Death Markov Processes with a Tree Structure and the MMAP[K]/PH[K]/1 Queue |
|
97-07 |
R.P. Pelot, J.P. Cyrus |
Optimization of a Large-Scale Scallop Hanging Cutlture Operation (7.B REVISED August 1998) |
|
97-08 |
J. P. Cyrus, R. Pelot |
A Site Management System for Shellfish Aquaculture (8.B REVISED May 1998) |
|
97-09 |
Jonathan Barzilai |
On the Decomposition of Value Functions |
|
97-10 |
H.A. Eiselt and C.-L. Sandblom |
Remote Probing |
|
96-01 |
Eldon A. Gunn and Bernie P. Lee |
Lagrangian Relaxation and Integer Programming Heuristics for a Vehicle Fleet Maintenance Scheduling Problem |
|
96-02 |
|
Some Aspects of a Simulation Model of Multiple-Cell Multiple-Product Manufacturing System Coordinated by Production Authorization Cards |
|
96-03 |
Ronald P. Pelot and J. David Fuller |
A Dynamically Consistent Stackelberg Pricing Model of Exhaustible Resources |
|
96-04 |
R.P. Pelot, J.W. Dwyer, J.M. Deaking and J.F. McCabe |
The design of a simulated forcible entry test for fire fighters (4b. REVISED AUGUST 1997) |
|
96-05 |
H.A. Eiselt, C.-L. Sandblom and N. Jain |
Optimizing The Location of a Sewage Treatment Plant: The Halifax Harbor Cleanup (5. REVISED JUNE 1997) |
|
96-06 |
Qi-Ming He |
Partial Roders and the Matrix R in Matrix Analytic Methods |
|
96-07 |
H.A. Eiselt and C.-L. Sandblom |
The Bounce Algorithm For Mathematical Programming (7b. REVISED October 1997) |
|
96-08 |
H.A. Eiselt, C.-L. Sandblom and C. Barnsley |
A Computational Investigation into Shapes of Polyhedra |
|
95-01 |
Gilles Cormier and Eldon A. Gunn |
A Model for Capacity Expansion Planning in Warehousing |
|
95-02 |
Eldon Gunn, Ed Bailey, Russel MacNally and Tim McGrath |
Using a least Absolute Deviation Approximation Method to Fit Tree Heights for Cruise Data, October |
|
95-03 |
B. Das and Y. Wang |
Determination of Isometric Pull and Push Strength Profiles in Workspace Reach Envelopes, June |
|
95-04 |
B. Das and N.L. Black |
A Statistical Analysis of the Factors Affecting Isometric Strength of Paraplegics in the Workspace, October |
|
95-05 |
Y. Wang, B. Das, A.K. Sengupta |
A Model for Determining the Inner Boundary of the Normal Horizontal Working Area, October |
|
95-06 |
B. Das and M. Forde |
The Determination of Isometric Push-up and Pull-down Strength Profiles in Workspace of Paraplegics, October |
|
95-07 |
B. Das and A. Garcia-Diaz |
Improving Material Handling and Dispatching Systems at the Workplace, May |
|
95-08 |
B. Das, J.K. Hennigan and M.D. Rolon |
Trepanning Process: Approach to Reducing Wear Pad Usage, May |
|
94-01 |
Wanda Rosa-Hatko and Eldon A. Gunn |
Queues with Switchover - A Review and Critique, January |
|
94-02 |
Tao Yang and M.L. Chaudhry |
On Steady-state Queue Size Distributions of the Discrete-Time GI/G/1 Queue, February |
|
94-03 |
Susan Y. Li, Tao Yang and Danny H.K. Tsang |
Source Modeling and Queueing Analysis of a Class of VBR Video Traffic in ATM Networks, February |
|
94-04 |
Tao Yang, Shengbin Hu and Qing Yang |
A Closed-Form Formula for Queueing Delays in Disk Arrays, March |
|
94-05 |
J. Russell Finley, János Pintér and Mysore Satish |
Aquifer Model Calibration Applying Global Optimization, April |
|
93-01 |
Eldon Gunn, Barclay Cunningham, and David Forrester |
Some Results with a Capacity Planning Model in a Coal Mining Enterprise, September |
|
93-02 |
János Pintér, Jay W. Meeuwig, Dirk J. Meeuwig, Mort Fels and David S. Lycon |
An Intelligent Decision Support System for Assisting Industrial Wastewater Management, September |
|
93-03 |
Eldon Gunn |
A Selected Bibliography on Operations Research Models and Environmental Decision Making, November |
|
93-04 |
Hui Li and Tao Yang |
A Single-Server Retrial Queue with Server Vacations and a Finite Number of Input Sources, November |
|
93-05 |
Tao Yang and Hui Li |
The M/G/1 Retrial Queue with the Server Subject to Starting Failures, November |
|
93-06 |
Jun Yeiu and Tao Yang |
Analysis of a Dynamic Bandwidth Allocation Scheme for ATM-based B-ISDN, November |
|
93-07 |
Tao Yang and Syed Shah |
The GI/D/1/K Queue and Resource Allocation for CBR Connections with Cell Delay Variations, December |
|
93-08 |
Tao Yang |
A Note on GI/M/1 Type Markov Chains, December |
|
92-01 |
T. Yang and D.H.K. Tsang |
A Novel Approach to Estimating the Cell Loss Probability of an ATM Multiplexer Loaded with Homogeneous Bursty Sources, January |
|
92-02 |
Tao Yang |
A Refinement of the Virtual Cell Loss Probability in an ATM Multiplexer, May |
|
92-03 |
Jun Yei and Tao Yang |
A Efficient Algorithm for Computing the Cell Loss Probability in ATM Networks, May |
|
92-04 |
J. Pemberton Cyrus, Zhi Wang ad Harvey H. Millar |
Nurse Scheduling with Individual Preferences: A New Formulation and Solution Technique, June |
|
92-05 |
Eldon A. Gunn |
Hierarchical Planning Processes in Forestry: Some Perspectives from Stochastic Programming, October |
|
91-01 |
B. Das, J.W. Kozey and J. Tyson |
A computerized potentiometric data collection system for static and dynamic anthropometric measurements, February |
|
91-02 |
Khalil, Falin, Yang |
Some Analytical results for Congestion in Subscriber Line Modules, March |
|
91-03 |
Wanda Rosa-Hatko and E.A. Gunn |
Applied Queueing Models with Switchover - A Critical Survey, March |
|
91-04 |
Eldon A. Gunn. |
Some Aspects of Hierarchical Production Planning in Forest Management, April |
|
91-05 |
J. Pemberton Cyrus, Chao Qian Li and David C. Wilson. |
A Resource Scheduling Methodology for Airline Crews, April |
|
91-06 |
J. Pemberton Cyrus, Zhi Wang and Chao Qian Li. |
Flow Formulations for Multi-level Location-Routing Problems, June |
|
91-07 |
Gilles Cormier and Eldon A. Gunn |
A Review of Warehouse Models, August |
|
91-08 |
Guennadi Falin, Zohel Khalil and Tao Yang |
Departure Processes: An Approach Based on the ERT Method, December |
|
91-09 |
Tao Yang and Hui Li |
The M/G/1 Retrial Queue with Server Vacations, December |
|
91-10 |
J.P. Cyrus and Gang Wu |
A Benders Decomposition Algorithm for Vehicle Scheduling with Time Windows, April |
|
90-01 |
E.A. Gunn and Peter Rutherford |
Integration of Annual and Operational Planning in a Coal Mining Enterprise, February |
|
90-02 |
E.A. Gunn, H.H. Millar, S.M. Newbold |
A Hierarchical Planning Structure for an Integrated Fishing Enterprise, A Tactical Level Linear Programming Model, February |
|
90-03 |
E.A. Gunn, H.H. Millar, |
Dispatching Fishing Trawlers to Meet Defined Tactical Requirements, March (Revised August) |
|
90-04 |
E.A. Gunn, S.M. Newbold |
Simple Models for Preliminary Diagnostic Analysis of the Tactical Level Fleet Planning Problem, February |
|
90-05 |
Glenn Allen, E.A. Gunn and Peter Rutherford |
Improving Throughput of a Coal Transport System with the Aid of Some Simple Models, March |
|
90-06 |
T. Yang, M.J.M. Posner and J.G.C. Templeton |
On Structures of Markov Processes, May |
|
90-07 |
Wanda Rosa-Hatko and E.A. Gunn |
Some Models of Queueing Control with Switchover, May |
|
90-08 |
t. Yang, M.J.M. Posner and J.G.C. Templeton June |
The Ca/M/s/m Retrial Queue: A Computational Approach |
|
90-09 |
T. Yang, M.J.M. Posner and J.G.C. Templeton |
An Approximation Method for the M/G/1 Retrial Queue with General Retrial Times, July |
|
90-10 |
E.A. Gunn, J.S. Rogers and P. Zenetos |
An Optimization Structure for Tidal Power Evaluation, September |
|
90-11 |
E.A. Gunn, J.S. Rogers and P. Zenetos |
An Optimization Structure for Tidal Power Evaluation, September |
|
90-12 |
J.P. Cyrus, C.Q. Li and D.C. Wilson |
Modelling Systems for Vehicle Scheduling with Resource Constraints, October |
|
90-13 |
J.P. Cyrus, D. Riordan and C.Q. Li. |
A Knowledge Based Identification System for Vehicle Routing and Scheduling Problems, May |
|
89-01 |
Diwakar Gupta |
Multiproduct Industries: A Case for Flexible Automation, January |
|
89-02 |
J.Pemberton Cyrus |
Vehicle Scheduling Models in Automated Production Systems, March |
|
89-03 |
Diwakar Gupta |
Determination of Economic Lot Sizes of Two Products on a Flexible Manufacturing Facility when Shortages are Permitted, April |
|
89-04 |
D. Gupta., Y. Gerchak and J.A. Buzacott |
The Optimal Mix of Flexible and Dedicated Manufacturing Capacities: Hedging against Demand Uncertainty, May |
|
89-05 |
J.P. Cyrus |
A Shortest Augmenting Path Algorithm for the Vehicle Scheduling Problem with Resource Constraints, September |
|
88-01 |
Ruhual Amin Sarker |
Solving Pm | pmtn,uan | Cmax or Pm | pmtn.Res,...,uan | Cmax Scheduling Problem, May |
|
88-02 |
Y.Y. Zhang, J.M. Chuang, C.-L. Sandblom, C.C. Hsiung |
A Quadratic Programming Approach for Minimizing the Wave Resistance of Swath Ships, May |
|
88-03 |
E.A. Gunn, H.H. Millar and S.M. Newbold |
Planning of Harvesting and Marketing Strategies for Integrated Fishing Firms under an Enterprise Allocation Scheme |
|
88-04 |
J. Pemberton Cyrus |
An Approximation Algorithm for the Vehicle Scheduling Problem, Vehicle Routing Problem and the Travelling Salesman Problem |
|
88-05 |
J. Pemberton Cyrus |
The Vehicle Scheduling Problem with Multiple Resource Constraints and Multiple Truck Types |
|
88-06 |
Ashraf Shikdar |
Application of Production Standards and Feedback in Industry |
|
88-07 |
Anne-Marie Permell |
A Support System for Optimization of the Product Mix in a Petroleum Refinery |
|
87-01 |
J. Pemberton Cyrus |
An Upper Bounding Theory for The Vehicle Scheduling Problem with Time Windows, June |
|
87-02 |
Ying-Yuan Zhang |
A Kind of Production Scheduling Problem and its Combinatorial Rule, December |
|
87-03 |
|
Methods for Simplifying Instances of the Vehicle Scheduling Problem with Time Windows, June |
|
87-04 |
|
Study on Time Horizon of Capacity Expansion Problems |
|
87-05 |
|
Simulation of Victoria General Hospital Emergency Room |
|
86-01 |
Harvey H. Millar |
A simulation study of the batch sizing problem in flexible manufacturing systems, February |
|
86-02 |
Harvey H. Millar |
Bicriterion optimization of tool-life and cutting speed for an orthogonal machining operation |
|
86-03 |
Harvey H. Millar |
Work in process inventory and batch sizes in flexible manufacturing systems |
|
86-04 |
J. Pemberton Cyrus |
A model of the vehicle scheduling problem |
|
86-05 |
Ashraf A. Shikdar |
Assigned versus participative production standard in a repetititve manufacturing task, May |
|
86-06 |
Ashraf A. Shikdar |
Optimum production standard and feedback and its effects to maximize worker productivity in a repetitive manufacturing task, May |
|
86-07 |
Ashraf A. Shikdar |
Satisfaction in assigned hard standard versus satisfaction in participative standard, June |
|
86-08 |
Ashraf A. Shikdar |
Consequences of optimum production standard and feedback on worker satisfaction in a repetititve manufacturing task, June |
|
86-09 |
Harvey H. Millar |
|
|
86-10 |
J. Pemberton Cyrus |
The VSP is NP complete: An NP-completeness proof for the vehicle scheduling problem with time windows, July |
|
86-11 |
C.-L. Sandblom |
On the Effects of Smoothing Optimal Economic Policies, June |
|
85-01 |
K. Ravi Kumar, Andrew Kusiak, Antony Vannelli |
Grouping of parts and components in flexible manufacturing systems, January |
|
85-02 |
Andrew Kusiak |
Planning of flexible manufacturing systems, January |
|
85-03 |
Harvey H. Millar |
Solving the bi-criterion multiproject selection problem: A combined approach, February |
|
85-04 |
Andrew Kusiak |
Automated material handling systems, February. |
|
85-05 |
Gerd Finke & Andrew Kusiak, |
Network approach to modelling of flexible manufacturing modules and cells, February |
|
85-06 |
J. Pemberton Cyrus |
Heuristic and optimal algorithms for the vehicle scheduling problem with time window, September |
|
85-07 |
Harvey Millar |
A hueristic algorithm for solving the single-level capacitated multiitem log size planning problem, May |
|
85-08 |
J. Pemberton Cyrus |
An augmented Lagrangean approach to the vehicle scheduling problem with time windows, November |
|
84-01 |
Biman Das & Andrew Kusiak |
Human factors problems of flexible manufacturing system, January |
|
84-02 |
Andrew Kusiak |
Robot applications in flexible manufacturing systems, January |
|
84-03 |
|
Missing |
|
84-04 |
Andrew Kusiak |
Flexible manufacturing systems: A structural approach, March |
|
84-05 |
J. Pemberton Cyrus and Andrew Kusiak |
The vehicle scheduling problem in automated guided vehicle systems, March |
|
84-06 |
Andrew Kusiak |
The part families problem in flexible manufacturing systems, July |
|
84-07 |
Andrew Kusiak |
Process planning models in flexible manufacturing systems, August |
|
84-08 |
E.A. Gunn |
A modified algorithm for generalized geometric programming |
|
84-09 |
Andrew Kusiak |
Production control of flexible manufacturing systems, May |
|
84-10 |
I. Yellowley and E.A. Gunn |
The optimal subdivision of cut in multi pass machining operations |
|
84-11 |
Andrew Kusiak |
Modelling and solving the information system design problem, October |
|
84-12 |
|
Missing |
|
84-13 |
Gerd Finke & Andrew Kusiak |
Network approach to modelling of flexible manufacturing systems, October |
|
84-14 |
Eldon A. Gunn, Mark Thorburn & Ajith K. Rai |
A decomposition method based on the augmented Lagrangian |
|
84-15 |
H.H. Millar & J.P. Cyrus |
Flexibility in manufacturing systems with considerations for flexible manufacturing systems |
|
83-01 |
|
Missing |
|
83-02 |
|
Missing |
|
83-03 |
|
Missing |
|
83-04 |
Andrew Kusiak |
Part families selection model for flexible manufacturing systems, February |
|
83-05 |
Andrew Kusiak |
Loading models in flexible manufacturing systems, March |
|
83-06 |
|
Missing |
|
83-07 |
Eldon A. Gunn & Andrew Kusiak |
The procurement problem: An integer programming problem well suited to a solution using duality, March |
|
83-08 |
|
Missing |
|
83-09 |
Andrew Kusiak |
Analysis of flexible manufacturing systems, Andrew Kusiak, May |
|
83-10 |
Andrew Kusiak |
Solving of attributes grouping problem in Database design, May |
|
83-11 |
|
Missing |
|
83-12 |
Andrew Kusiak |
An automated system of mechanical part recognition, July |
|
83-13 |
|
Missing |
|
83-14 |
|
Missing |
|
83-15 |
|
Missing |
|
83-16 |
|
Missing |
|
83-17 |
|
Missing |
|
83-18 |
|
Missing |
|
83-19 |
Andrew Kusiak and Harvey Millar |
Mathematical models in aggregate and disaggregate production planning: A survey and structure classification |
|
82-01 |
Andrew Kusiak |
Computerized control of flexible manufacturing systems, September |
|
82-02 |
Eldon A. Gunn and Andrew Kusiak |
A methodology for application of fenchel's duality theory to large scale systems, Eldon A. Gunn and Andrew Kusiak, October |